The floor is the first thing anyone notices.
Strip and wax, scrub and recoat, burnishing and sealed-concrete care, with our own machines and our own crew. The service most cleaning companies subcontract.

A floor is a maintenance schedule, not a one-time job.
Vinyl tile that is burnished monthly and recoated twice a year looks new for a decade. The same tile left alone for eighteen months needs a full strip and four coats of finish, and half the time the tile is scratched through. Sealed concrete works the same way: scrubbed regularly it stays bright and dust-free; ignored, it powders and stains.
So we do not sell floor care as a project. We write a floor schedule into your cleaning scope, so the expensive job almost never comes up.
- Vinyl composition tile (VCT) and sheet vinyl: strip and wax, scrub and recoat, burnish
- Sealed and polished concrete: auto-scrub, spot-treat oil and tyre marks, reseal on schedule
- Ceramic and porcelain tile: machine scrub, grout detail
- Epoxy and rubber floors: scrub with the right pad and product for the surface
- Carpet: hot-water extraction and spot treatment

How a strip and wax is done properly.
The difference between a floor that shines for a year and one that yellows in a month is in steps two and four.
- 01
Clear and protect
Furniture moved or tagged, edges and baseboards masked, the area closed with signs. We schedule it for a night or a weekend so nobody walks on it wet.
- 02
Strip to bare tile
Stripper applied and dwelled, old finish removed with the machine and a black pad, edges done by hand, then a full rinse. Any old finish left behind shows through the new coat.
- 03
Neutralize and dry
A neutralizing rinse brings the tile back to a pH the finish will bond to. The floor is dried completely before a drop of finish goes down.
- 04
Apply finish, thin coats
Four to five thin coats of a commercial floor finish, each one cured before the next. Thick coats trap moisture and cloud; thin coats build a hard, clear surface.
- 05
Cure and return
The floor stays closed until the last coat is cured, usually overnight. Furniture back, mats down, and a note to you with the recommended burnish and recoat schedule.
- 06
Maintain
Monthly burnishing and a scrub and recoat every six to twelve months keep the floor at this standard without another strip for years.
Tell us about the building.
Thirty to forty-five minutes on site, then a written scope and a fixed monthly price. No obligation, no pressure.
- 01We call you back within one business day.
- 02We walk the site with you, 30 to 45 minutes, at a time that suits your building.
- 03You get a written scope and a fixed monthly price. No obligation.